Project_Dylan_110618-68-copy Project Dylan

Project Dylan is a new prototype fulfillment center for Amazon. The warehouse building has an approx. footprint of 700,000 SF slab on grade and another 1.95 million SF of elevated deck. The exterior is clad with 330,000 SF of full height composite insulated tilt-up panels. The panels are non-load bearing for gravity but as a VE alternate on the project, the panels do carry large shear forces for seismic loading.  

With the tallest panel standing at 81’-1” tall, Concrete Strategies (CSI) set a company record for the tallest tilt-up panel ever erected on a project and an industry record for the tallest composite panel ever constructed. This was accomplished utilizing an innovative composite panel design by Needham DBS.  Meadow Burke introduced the Super 62 which was used on this project.  The composite panel industry is on the frontier of emerging design technologies, the innovation is ripe to propel our industry in to the future.