Skip to main content

Lenexa
913.385.5300

Fort Wayne
260.497.8400

Industry Axis

Hand and Gebel Present at Tilt-Up Convention

ProjectDylanPresentation1

Karen Hand, President at Needham DBS, and Barclay Gebel, VP Operations at Concrete Strategies, teamed up to present the Case Study for Project Dylan to a packed house at the 2019 Tilt-Up Convention and Expo held in Atlanta.

The composite panel industry is on the frontier of emerging design technologies; the innovation is ripe and ready to propel our industry into the future. Project Dylan is a new prototype fulfillment center, and this seminar will use it as a case study to better understand today’s composite panel industry. The warehouse building’s slab-on-grade footprint is approximately 700,000 square feet, and it has an additional 1.95 million square feet of elevated deck. The exterior is clad with 330,000 square feet of insulated tilt-up panels.

Continue reading

Rising to the Challenge

Project_Dylan_110618-68-copy Project Dylan

Project Dylan is a new prototype fulfillment center for Amazon. The warehouse building has an approx. footprint of 700,000 SF slab on grade and another 1.95 million SF of elevated deck. The exterior is clad with 330,000 SF of full height composite insulated tilt-up panels. The panels are non-load bearing for gravity but as a VE alternate on the project, the panels do carry large shear forces for seismic loading.  

With the tallest panel standing at 81’-1” tall, Concrete Strategies (CSI) set a company record for the tallest tilt-up panel ever erected on a project and an industry record for the tallest composite panel ever constructed. This was accomplished utilizing an innovative composite panel design by Needham DBS.  Meadow Burke introduced the Super 62 which was used on this project.  The composite panel industry is on the frontier of emerging design technologies, the innovation is ripe to propel our industry in to the future.