Karen Hand, President at Needham DBS, and Barclay Gebel, VP Operations at Concrete Strategies, teamed up to present the Case Study for Project Dylan to a packed house at the 2019 Tilt-Up Convention and Expo held in Atlanta.
The composite panel industry is on the frontier of emerging design technologies; the innovation is ripe and ready to propel our industry into the future. Project Dylan is a new prototype fulfillment center, and this seminar will use it as a case study to better understand today’s composite panel industry. The warehouse building’s slab-on-grade footprint is approximately 700,000 square feet, and it has an additional 1.95 million square feet of elevated deck. The exterior is clad with 330,000 square feet of insulated tilt-up panels.