Mock-Ups: Worth Their Weight In Gold

MockUpLift

What could make a 72'-6" panel more complicated?  The introduction of a new product.  The iconX composite connectors for insulated panels brought a lot of questions from the tilt-up subcontractor and the general contractor. The project is complex and the panels are very large.  Therefore, the decision to build a mock-up panel was worth its weight in gold.

Prior to the pour, the contractor got hands-on with the iconX composite connector and insulation to develop a marking and handling system to make the project run smoothly. The contractor then studied the sequencing of embeds, welded wire reinforcing mats, miscellaneous rebar placement, iconX connector and insulation installation, concrete placement and finishing and lifting/bracing hardware placement.  

Continue reading

UVA Ivy Stacks Underway

20171102_132915

The first tilt-up concrete building on the historic campus of the University of Virginia is now underway. Needham DBS worked with Nielsen Builders to design an insulated, composite tilt-up panel system for the Ivy Stacks Expansion project, an addition to an existing precast building. The panels are over 45’ tall, and feature the innovative IconX Model 23 composite connector (www.iconxusa.com), with edge-to-edge XPS insulation, in a 4 5/8-2-4 5/8 configuration (11 ¼” overall thickness). This design uses 30% less concrete than the comparable non-composite panel design. The site is extremely tight, with very limited panel casting area and narrow crane path. Panels are scheduled to be tilted in mid-December.