Skip to main content

Lenexa
913.385.5300

Fort Wayne
260.497.8400

Zona Rosa - Blackford Building

Kansas City, Missouri
2008 Tilt Up Achievement Award Winner

Project is a 68,000 sq ft footprint, three story office buiding. The project consisted of conventional steel framing with a load bearing concrete tilt up panel wall system. The project included 7500 square feet of cast in brick using the brick snap system. Steel and tilt up detailing using the CD2 process was included in the scope.

Innovation was used to create the architectural pilasters on the exterior of the building without visible joint lines. Intricate brick detailing, joinery and architectural recesses created a challenging project. Close communication with the contractor and architect during the planning stage were the key to the successful completion of the project.

 

 

 

 

 

 

RELEVANT TASKS

Tilt Up Concrete
Concrete Design
Steel Design
Steel Detailing
Retail and Office
Innovation

COMPLETION DATE

October 2008

CLIENT REFERENCES          

Meyer Brothers
Lee's Summit, MO

Summit Concrete
Lee's Summit, MO