Phoenix North Transfer Station and Materials Recovery Facility

Phoenix, Arizona

Needham DBS teamed up with Sure Steel to provide engineering and detailing services on the fast-track design-build project.  Needham DBS was able to use a hybrid conventional primary steel and PEMB secondary steel system work together for an economical system.  The 215,000 SF building contained 1200 tons of steel with challenges such as complex geometry, varying roof planes and large clear spans.

 

RELEVANT TASKS

Steel Design
Hybrid PEMB Design
Steel Detailing

COMPLETION DATE

2005