Covert Energy Center

Covert, Michigan

Structural engineering of heavy structural steel, mill building turbine hall framing. Turbine hall included a 125 ton crane-way design. Scope required extensive coordination of PEMB products with conventional steel products.

Needham also acted as the life-safety architect and code administrator for facility, as well as architect for the office building.

RELEVANT TASKS

Long-Span Steel
Heavy cranes
Design-Build
Industrial
Hybrid PEMB

COMPLETION DATE

2002

CLIENT REFERENCES          

Blaine Construction
Knoxville, TN